During December, the Museum floor was cleared and many buses temporarily stored on the Brooklands Finishing Straight.
The floor was cleared of small exhibits and then cleaned. Buses were then returned and carefully manoeuvered into temporary positions before remodelling work begins on the Museum interior.
Photos show the T and the Tilling ST being moved by various means and LBM volunteers taking a tea-break.
The final photos show the the continuing work on the NS with work on the driver’s canopy and seats progressing, and the “Red” and “Green” corners as at 16th December.